22TCN 334-06 PDF

Saturday, August 05, AM 22 TCN 06 Pheu rot Monday, September 21, AM 22TCN Thi cong va. higher than the requirements in standard 22TCN 06 (22TCN, ). – Water absorption of both RAs is higher than that of the natural. 28 Tháng Mười Hai 22 TCN – 06Documents · 22 tcn Documents · PL 03 plan CVC 22 02 pdfDocuments · 22 71 02 Facility Natural-Gas Piping.

Author: Tugor Kale
Country: Switzerland
Language: English (Spanish)
Genre: Life
Published (Last): 17 February 2014
Pages: 214
PDF File Size: 2.5 Mb
ePub File Size: 10.67 Mb
ISBN: 753-6-27796-469-8
Downloads: 67872
Price: Free* [*Free Regsitration Required]
Uploader: Shagore

An economical design is that for unusual weather conditions, a certain downtime of the channel would be acceptable. The truck lane can be used for construction of the port during the Construction Stage before commencement of operations.

crushed aggregate cbr test

Rod damper Apron Feeders Item No. As far as the design conditions of Dong Lam Cement Specialized Port concerns, which are medium volume of clinker handling, medium size of design ship, high loading rate due to strict natural conditions, and environmental protection, the fixed and travelling ship loader types would be considered for the overall comparison. Figure summarizes the result of alternatives comparison with a view that Alternative-2, Sloping Concrete Caisson Type is superior to the other alternative in the Project.

This pavement structure is designed for the 3334-06 of Excavator has two axles and operation weight is 22, kg, transports coal and clinker from storage yards to receiving hoppers. In case of the A-I. It is not possible and proper to draw any conclusion on feasibility of the overall project only from the result of this Study. The sand drift can happen mostly in the breaker zone on coastal waters, where waves break and cause strong wave-induced current, movement of sediments, and eventually change of shoreline.

The tank has RC structure and is countersunk in the soil. The clinker and coal handling system on the Land Port Area is illustrated in Figure The coal is extracted with a belt feeders Item No. Three pumps are located in the Pump room: After completion of the Breakwater it can be used for the base of bug boats, pilot boats and other service vessels during the summer season. Crushed limestone aggregate with soaked CBR between Draft at the time of light weight 2.

  FUNDAMENTOWANIE RYBAK PDF

Utilization of cement treated recycled concrete Utilization of cement treated recycled concrete Wave 50 years occurrence: Bearing Ratio CBR test and other tests were used to characterize the. It is very costly to design the 222tcn depth to be able to operate for all hard navigation conditions.

To save energy, the following design criteria are applied to 22ttcn lighting system; For external lighting, high pressure sodium vapor lamp HPSV will be used: Sm2 silo m m3 ton m2 m3 ton m2 m2 m2 m2 m2 L.

Dong Lam Cement Specialized Port – Basic Design Report – Final – [PDF Document]

JPCBasic Design ReportFebruary Dong Lam Cement Specialized Port ProjectJapan Port Consultants, Ltd 3 Temporary Construction Base and Yard At least, an area of 3ha is required for the temporary construction base and 22ttcn to accommodate an 2tcn, a parking space for cars and construction equipment, a construction material stock yard, a concrete mixing plant and a yard for manufacturing concrete blocks.

The only means to increase the calmness is to construct breakwater s to protect the port area from sea waves. The critical wave height, Hc, is taken as 0. This information will constitute literally the baseline data for future discussions on the effect of port development and long-term change in the shoreline due to sand drift phenomena in the area, or change in the coastal process. Collaborations between ship schedule and weather forecast is indispensable in consideration of safe and economic operations of the Port.

Most stackers cannot provide enough lift to get over the side of the ship.

  DIX HALLPIKE MANEUVER PDF

The main port entrance is defined to be from the south. Length of the breakwater: Experienced supervisors and skilled workers shall be essential for the installation work. Report on the environmental investigation of the Cau Hai lagoon and surrounding area.

TCN COLON

The photo given in Photo A shows a pedestal ship loader designed for loading coke into DWT-sized ships. For the design ship the combined RAO for heave, pitch and roll was estimated at 1. Variations of the quadrant ship loader are available that can increase the loading range. That work can be commenced after reinforcement of the public road to the site as temporary access. The lighting structure for the monopole will be motorized for ease of maintenance. In addition to the cost of the ship loader, there is the cost of the feed conveyor running the full length of the dock and a tripper.

A numerical test method of California In order to better understand the mechanical properties of graded crushed rocks GCRs and to optimize the relevant design, a numerical test method based on the particle flow modeling technique PFC 2D is developed for the California bearing ratio CBR test.

CBR test is a simple strength test that compares the bearing capacity of a In order to better understand the mechanical properties of graded crushed rocks GCRs and to optimize the relevant design, a numerical test method based on the particle flow modeling technique PFC 2D is developed for the California bearing ratio CBR test.

Use the Design chart for passes and This report presents the results of planning and basic design of the sea port the Sea Portincluding the port areas in the sea Sea Port Area and on the land Land Port Area.

Author: admin