ELASTOPHENE FLAM 25 PDF

ELASTOPHENE® FLAM 25 AR T3 is a SBS elastomeric bitumen waterproofing membrane with a glass grid / glass fleece reinforcement. The topside is protected . ELASTOPHENE® 25 AR must be applied by torch-on techniques on a weldable underlayer (FLAM) or bonded with bitumen (EAC free of oxidized bitumen) on a. ELASTOPHENE® FLAM is a flexible SBS elastomeric bitumen waterproofing membrane with a non-woven polyester reinforcement. Both sides are.

Author: Goltisho Brakora
Country: Libya
Language: English (Spanish)
Genre: Software
Published (Last): 25 June 2006
Pages: 234
PDF File Size: 6.57 Mb
ePub File Size: 5.87 Mb
ISBN: 224-9-79703-875-8
Downloads: 59538
Price: Free* [*Free Regsitration Required]
Uploader: JoJogor

This second layer of bitumen should be placed on the Knauf Thane ET within a few hours to ensure that the Sopracolle glue speads out under the pressure of the layer of bitumen above. The collector is trimmed before applying the outer reinforcement.

Click on the photos to enlarge them. Il elxstophene bien plus rapide de remplacer les renforts par le flashing: The rain water collector will pass through this. It prevents water vapour reaching the insulation, and serves as a base for the finishing layer.

Cinq points de Sopracolle par plaque. Before the insulation is laid, the channels carrying the rain water are reinforced: The orientation of the second layer depends on the way in which the third layer will be applied. The first elastopene and the sidewall reinforcement are complete after 4 days.

  AT24C16 DATASHEET PDF

Before work begins, the existing concrete surface was cleaned with a high pressure bar hose equipped with a rotating jet. Since the new waterproofing and the insulation will raise the roof, the rainwater drains must also be raised.

ELASTOPHENE® 25 AR

Pas une goute n’entre dans la maison. These are ajusted now but will be fitted later taking into account the future height of the finished surface. When reading estimates for waterproofing on flat roofs you may find elastophnee the estimate is lightened to reduce the price.

The first layer, which provides the waterproofing, is of elastic bitumen, 2. Rodolphe Ferracane, e-mail contact AFR-etancheite. Heating the outer-reinforcement and the collector. Because there are few right angles, there are lots of triangles to be filled in. Removal of remnants of previous waterproofing.

Click on photo to enlarge. Creative Commons Attribution – NoDerivs 3. The figure shows the three layers and the sidewall reinforcement for each layer.

ELASTOPHENE FLAM 180-25

Cutting nord end of a roll of finishing layer. Welding the outer reinforcement onto the collector. Click on figure to enlarge.

The work specified by this standard is often referred to as Three layers plus insulation, with heated reinforcement. The two layers should be perpendicular to one another.

  JEDANAEST MINUTA PAULO KOELJO PDF

ELASTOPHENE FLAM – Soprema

Cliquer sur les photos pour les agrandir. As with the 1st layer, the joint of the flat roof and the rising walls that surround the roof are a possible source of leaks. Creative Commons Attribution – Elastohene de Modification 3. Fitting the 2nd layer in front of the future rain collector. The joint of the flat roof and the rising walls that surround the roof are a possible source of leaks.

For example the first layer could be omitted, and the insulation glued directly to the existing surface.

La partie bitume fait approximativement 2. The Elastophene 25 is rolled out and cut to fit. Finishing around rain water collector See 2. On my roof, the rolls of the final layer are positioned north-south, so the second layer must be east-west.

Author: admin