FOSFATOS BAYOVAR PDF

Phone, Suggest a phone number Fosfatos Bayovar – Piura. Work Project. Unofficial Page. Fosfatos Bayovar – Piura. Posts about Fosfatos Bayovar – Piura. Fosfatos del Pacífico S.A. is a public Company listed in the Lima Stock Exchange non-metallic mining activities in Bayovar 9, in which, up to date, significant. FOSFATOS DE BAYÓVAR. No description Transcript of FOSFATOS DE BAYÓVAR. OBJETIVOS FOSFATOS DE BAYÓVAR. Full transcript.

Author: Kazrakazahn Shagal
Country: Kazakhstan
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 6 May 2010
Pages: 273
PDF File Size: 11.77 Mb
ePub File Size: 6.82 Mb
ISBN: 678-7-69089-884-7
Downloads: 68115
Price: Free* [*Free Regsitration Required]
Uploader: Daicage

The sensitivity analysis shown in Table compares the project discounted cash flow, IRR, and payback period against the base case when the commodity prices, initial capital and operating cost are varied. Stratigraphic and Structural Model. The status report February 9, with respect to the mining concessions on the Bayovar 12 Project property states that the fisfatos are in good standing and that Agrifos, the Peruvian subsidiary of Focus Ventures, holds title in good standing.

Conducted geotechnical and hydrogeological investigations including drilling to determine the conditions for open pit design and TSF construction. Drill Collar Verification Map. The volumes for each phosphorite and diatomite bed were then converted to tonnes using the phosphorite bed specific relative density values. The zone is subdivided into seven regionally correlatable phosphorite beds alternating bayovat diatomite beds.

Applicable Regulations to the Project. The purpose of attrition scrubbing is to disaggregate the remaining diatomite fosfatis that it can be removed by desliming.

CROPS Inc. – Photo Gallery – Bayovar 12 Photos – Mon Dec 31,

During the normal course of the review, the Authors have not discovered any reason to doubt that assumption.

Canadian standards, including NIdiffer significantly ffosfatos the requirements of the United States Securities and Exchange Commission fosftosand reserve and resource information contained in this report may not be comparable to similar information disclosed by U. Below in Table is a summary of the cost by area for a typical operating year at full production. Beds PH01 to PH There have been no surface geochemical sampling programs conducted on the Bayovar 12 Concession and there have been no surface or airborne geophysical surveys conducted on the Bayovar 12 Concession.

  BILLY PEGRAM PDF

Capital expenditures incorporate all mining equipment costs, tailings facility and mine haul road development. The royalty basis is 3.

Digital Surface Model Extents. Keep current preference and visit. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in-place tonnage and grade without reference to unit measures.

A stream from the Seawater Pond will be taken to a reverse osmosis RO desalination plant, whose brine product will be discharged to the seawater ponds.

NI is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadian company of scientific and technical information concerning mineral projects. Permits Required for the Project. Organized the site plan with respect to plant ancillary buildings to accommodate the new design.

Sedimentary phosphate deposits are stratiform bodies that commonly comprise alternating mineralized and barren zones; the individual zones can range from sub-metre thickness up to tens of metres thick, with the overall thickness of mineralized and barren sequence commonly forming in bayovarr of several hundred metres.

Visible gold in trenching at Risti.

Fosfatos Bayovar – Piura

The phosphate bearing units occur in the upper to m of the Miocene The drill holes from the Focus Phase 1 and Phase 2 exploration programs are presented in Figure The process plant operating costs are summarized by area and then by cost element of labor, electric power, reagents, maintenance parts and supplies and services. Mineral Resources reported are inclusive of tonnes converted to Mineral Reserves in subsequent sections of this report. Concessions can be granted for either metallic or non-metallic minerals and allow both exploration and exploitation.

  KWASHIORKOR PATHOPHYSIOLOGY PDF

Initial mining requires ex-pit storage of waste rock, both overburden and interburden.

Fosfatos del Pacifico (Ingles)

Pit Wall inter-ramp slope angle. JPQ was granted surface rights access for 99 years and a 30 year land use easement renewable under agreements signed with the community of San Martin de Sechura Fundacion Comunal San Martin de Sechura.

Primary mine fleet requirements will include a maximum of two tph surface miners, four 31 cubic metre FEL, four track bqyovar, thirty seven tonne haul trucks with cubic metre coal beds, graders, compactors, water trucks, and other ancillary mining equipment. The property is located approximately km north of the Peruvian capital, Lima, 65 km south of the town of Sechura and 90 km southwest of Piura. No faulting or folding was identified within the concession.

Visible gold in trenching at Risti Discovery. Developed mineral resource estimates for Measured, Indicated, and Inferred, according to CIM definitions and compliant with NI reporting requirements. Cycles of uplift and subsidence modified the basin during its long infilling history, with basement faults partially controlling basin geometry during deposition.

Author: admin