KTA 3903 PDF

KTA – Revision mark. This document has been modified by: KTA Ber Loading recommended items Back to top. About us. KTA () Inspection, Testing and Operation of Lifting Text; Inspection, · Requirements, · Materials, · Lifting, · Component, · Examination, · Specimen. Philosophy of KTA and KTA Norbert Schilling, NKMNOELL. – Fennovoima, Finland 6 – Hanhikivi 1. Vesa-Pekka Arola, Fennovoima.

Author: Tokora Bakinos
Country: Norway
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 20 October 2009
Pages: 161
PDF File Size: 9.77 Mb
ePub File Size: 16.44 Mb
ISBN: 731-6-55128-442-5
Downloads: 94107
Price: Free* [*Free Regsitration Required]
Uploader: Zukinos

It is a 390 of the KTA that these exceptions – other than those in the case of shall normally – are specified in the text of the safety standard, shall normally indicates a requirement to which exceptions are allowed. As regards design approval documents required for production tests see Section Documents regarding electrical equipment a schematic diagrams, b circuit diagrams, c layout plans for control cabinets, control panels and control units, d parts lists specifying technical data, e data sheets of ea drive components, converters and eb electrical operational means for functions classified into Performance Levels c, d or e to Annex E of KTAf compilation, description and representation of the mode of operation of measuring, control, monitoring, and safety equipment, 393 compilation of the measures intended and the related documents required to meet the DIN IEC requirements as per KTAsub-clause 5h where RAM programmable systems e.

Structural Welding Requirements and the Building Official. Risk Assessment of Mechanical Equipment: Accessibility, structure and marking d Electric mains, electric main connection switch, crane disconnecting switch, crane switch e Control stands, operating equipment, wireless controls, control stands interlocks, emergency stop devices DIN ENSections 4.

  EMPOASCA KRAEMERI PDF

Over the last years of model boiler making the only real change in construction methods has been the change over from rivets and caulking. DIN jta, Sections 9 and 10, however with 1. Parts lines Number of lines of rope supporting the load block or. In addition, the following supplementary examinations shall be performed: Standards d for Certification 2.

Safety Standards. of the Nuclear Safety Standards Commission (KTA)

This manual does not cover the procedure for disenabling. Welds with particular quality acc. Installation and operating instructions. On newer versions of Microsoft Word More information. Taking into account the meaning and usage of auxiliary verbs in the German language, in this translation the following agreements are effective: Presented by Paul Laidler.

Programme Nuclear Cranes Seminar – Preliminary Program – Kika Cranes Seminar

Failure to follow these inspection procedures can cause More information. Work is to be performed in conjunction with the manufacturer s.

No times the operational load. The documents required under ha and hb should be submitted in kat time prior to establishing the documents required under hc so that an evaluation of the basic design features of the software e. This manual does not cover the procedure for disenabling More information.

Where the evaluation of the accident shows that safe continued operation is possible only the following transport operations may be performed: The performance of radiography shall be spot-checked by the authorized inspector. Extent of final inspection continued 8 Acceptance testing 8. They are straightforward to inspect More information.

For the establishment of operating and maintenance instructions see also DIN EN e documentation and certification of tests and inspections performed in acc. Load testing and inspection of overhead cranes is required by many safety regulations, national consensus More information. Standard Caps you are here: The operating weight includes the basic machine with HD undercarriage, 2 main winches kn with speed change gear and 11 m boom, consisting of A frame, boom ktq 4 mboom head section 6.

  BALLERINO NATE PDF

9303 Vario Line Spring pressure single-disc brake 76 Component 1 Load support structures, running wheels incl.

System trolleys must More information. Extent of final inspection continued. For butt welds with wall thicknesses equal to or smaller than 15 mm radiography shall be used; for wall thicknesses greater than 15 mm and equal to or smaller than 40 mm 390 testing shall preferably be used, alternatively radiography.

Extent of acceptance testing.

Introduction Fillet welds are the predominant arc welded joint in Australia. Application of Welding Standards in Hong Kong. Non-destructive tests shall be performed in accordance with Annex B.

Over the last years of model boiler making the only real change in construction methods has been the change over from rivets and caulking More information. The type and extent of this basic inspection shall be fixed in an inspection instruction. On newer versions of Microsoft Word.

Oil and gas industry Chemical industry Pharmaceutical industry Agribusiness Without. Start display at page:. To use this website, you must agree to our Privacy Policyincluding cookie policy.

Failure to follow these inspection procedures can cause kha injury and property damage. Regulations referred to in this Safety Standard Annex F: Addendum 1 March Effective Date: Extent of final inspection.

Author: admin